Two big things happened yesterday: 1) Rob quit his job, and 2) our first piece of equipment was delivered to our space (a blowdown separator, pictured - ain't it cool?). What this means is that it's getting real - real quick. We're in the final stages of our design phase; plans are drawn and engineering specs completed. Over the next month our space will undergo dramatic transformation, as the brewhouse is outfitted, and taproom, office and bathrooms are constructed. Our brewing equipment is due to be delivered in April, and we can't wait to get started with installation, optimization, and test batches.